New electrical conduit in Room 224 needs to be painted
Number: 1254
Post date: March 30, 2023
Submission
Name: Craig Johnson
Department: Building Operations
Email: cjohnson@ksu.edu
Phone: (785) 532-6591
Type of Problem: Cosmetic
Priority: Address When Possible
Long Description of Problem:
The new conduit for the AV system needs to be painted the gray color of the wall paint. The AV is scheduled to be install some time after April 10, and the painting should be finished prior to the system installation.
Specific Location: 2 - 224 - Room 224
Requested Deadline?: April 8, 2023
Work Details
Progress Level: Completed