Completed Orders
Number | Title | Type of Problem |
Priority![]() |
Progress Level | Requested Deadline? | Created |
---|---|---|---|---|---|---|
33 | Bathroom Leak | Repair | High Priority | Completed | 3/15/18 | 3/19/18 |
1040 | call in service on three pieces of equipment in CFA | Repair | High Priority | Completed | 6/8/22 | 6/29/22 |
1468 | Batterie issue | Preventive Maintenance | High Priority | Completed | 10/11/23 | 10/10/23 |
357 | slow drain | Repair | High Priority | Completed | 11/13/18 | 11/12/18 |
1349 | Batterie issue | Repair | High Priority | Completed | 6/17/23 | 6/16/23 |
1224 | Replace light bulb | Repair | High Priority | Completed | 2/22/23 | 2/21/23 |
1655 | Faucet issue | Repair | High Priority | Completed | 4/26/24 | 4/25/24 |
763 | Faucet in south ground floor men's restroom not working. | Repair | High Priority | Completed | 8/24/20 | 8/19/20 |
203 | Rocket Bowl lights | Enhancement | High Priority | Completed | 8/18/18 | 8/9/18 |
1284 | sink issue | Repair | High Priority | Completed | 4/27/23 | 4/26/23 |
67 | paper towel sensor not working correctly | Repair | High Priority | Completed | 4/25/18 | 4/24/18 |
1073 | install wall box for networking | Enhancement | High Priority | Completed | 8/11/22 | 8/5/22 |
824 | Need our (3) coin machines cleaned and repaired | Preventive Maintenance | High Priority | Completed | 3/3/21 | 3/2/21 |
265 | Acoustical panel coming off in the Bowling Center | Cosmetic | High Priority | Completed | 9/25/18 | 9/18/18 |
1561 | Door wont latch | Repair | High Priority | Completed | 2/17/24 | 2/16/24 |
358 | soap will not prime | Repair | High Priority | Completed | 11/14/18 | 11/13/18 |
1889 | beeping in bathroom either air freshner or toilet | Preventive Maintenance | High Priority | Completed | 12/10/24 | 12/9/24 |
1225 | Window pane gaps | Repair | High Priority | Completed | 2/28/23 | 2/23/23 |
449 | Ice Cream machine is making a very loud metal rubbing against metal noise | Urgent | High Priority | Completed | 3/7/19 | 3/6/19 |
1318 | Faucet issue | Repair | High Priority | Completed | 5/20/23 | 5/19/23 |
1769 | Podium rail | Repair | High Priority | Completed | 9/4/24 | 9/3/24 |
637 | problems with lock on Business office door | Urgent | High Priority | Completed | 10/24/19 | 10/24/19 |
1285 | drain | Repair | High Priority | Completed | 4/27/23 | 4/26/23 |
423 | Bad wheel | Repair | High Priority | Completed | 1/25/19 | 1/24/19 |
1502 | Chair arm on second floor concourse has come loose. | Cosmetic | High Priority | Completed | 12/1/23 | 11/28/23 |
298 | Damaged Fire Door | Safety | High Priority | Completed | 10/13/18 | 10/12/18 |
732 | install Cover-19 plexiglass at Call Hall | Cosmetic | High Priority | Completed | 8/7/20 | 8/3/20 |
1924 | Temperature adjustment Union 302C | Unspecified Assistance | High Priority | Completed | 2/8/25 | 2/6/25 |
1470 | Can light falling out of ceiling | Cosmetic | High Priority | Completed | 10/18/23 | 10/12/23 |
1258 | file cabinet accidently locked - can't find key | Repair | High Priority | Completed | 4/8/23 | 4/3/23 |
1690 | 227 projector | IT | High Priority | Completed | 6/4/24 | 6/3/24 |
1562 | Toliet cracked | Repair | High Priority | Completed | 2/17/24 | 2/16/24 |
1226 | Window pane gaps | Repair | High Priority | Completed | 2/28/23 | 2/23/23 |
1015 | toliet continuing to flush. water is shut off | Preventive Maintenance | High Priority | Completed | 5/11/22 | 5/10/22 |
450 | Cabinet hinge is broken! | Repair | High Priority | Completed | 3/8/19 | 3/7/19 |
238 | South stairwell handrail wire | Repair | High Priority | Completed | 9/21/18 | 8/31/18 |
1319 | Door | Repair | High Priority | Completed | 5/20/23 | 5/19/23 |
1107 | Paint and patch | Custodial | High Priority | Completed | 9/24/22 | 9/14/22 |
1625 | Clock in Courtyard is display wrong time | Cosmetic | High Priority | Completed | 4/10/24 | 4/8/24 |
765 | A couple issues with the padded scrubber | Repair | High Priority | Completed | 8/28/20 | 8/27/20 |
205 | 226 Table needs closers fixed | Repair | High Priority | Completed | 8/10/18 | 8/9/18 |
206 | Sharps containers are full | Safety | High Priority | Completed | 8/10/18 | 8/9/18 |
1286 | remove Employee Achievement plaque from wall | Cosmetic | High Priority | Completed | 4/27/23 | 4/26/23 |
1503 | door closer broken | Repair | High Priority | Completed | 12/1/23 | 11/30/23 |
1991 | Crestron in Wildcat Chamber | IT | High Priority | Completed | 4/18/25 | 4/17/25 |
606 | Damage ceiling tile | Cosmetic | High Priority | Completed | 9/11/19 | 9/6/19 |
1596 | Ceiling vents need cleaning | Cosmetic | High Priority | Completed | 4/5/24 | 3/13/24 |
36 | soap is out | Repair | High Priority | Completed | 3/22/18 | 3/21/18 |
1259 | Restroom stall missing latch | Repair | High Priority | Completed | 4/4/23 | 4/3/23 |
1227 | Paint and patch needed for gallery, un-install is tomorrow | Cosmetic | High Priority | Completed | 3/2/23 | 2/27/23 |
- ‹ previous
- 6 of 36
- next ›