Completed Orders

E.g., 6/10/25
E.g., 6/10/25
Completed Orders
Number Title Type of Problem Prioritysort descending Progress Level Requested Deadline? Created
33 Bathroom Leak Repair High Priority Completed 3/15/18 3/19/18
1040 call in service on three pieces of equipment in CFA Repair High Priority Completed 6/8/22 6/29/22
1468 Batterie issue Preventive Maintenance High Priority Completed 10/11/23 10/10/23
357 slow drain Repair High Priority Completed 11/13/18 11/12/18
1349 Batterie issue Repair High Priority Completed 6/17/23 6/16/23
1224 Replace light bulb Repair High Priority Completed 2/22/23 2/21/23
1655 Faucet issue Repair High Priority Completed 4/26/24 4/25/24
763 Faucet in south ground floor men's restroom not working. Repair High Priority Completed 8/24/20 8/19/20
203 Rocket Bowl lights Enhancement High Priority Completed 8/18/18 8/9/18
1284 sink issue Repair High Priority Completed 4/27/23 4/26/23
67 paper towel sensor not working correctly Repair High Priority Completed 4/25/18 4/24/18
1073 install wall box for networking Enhancement High Priority Completed 8/11/22 8/5/22
824 Need our (3) coin machines cleaned and repaired Preventive Maintenance High Priority Completed 3/3/21 3/2/21
265 Acoustical panel coming off in the Bowling Center Cosmetic High Priority Completed 9/25/18 9/18/18
1561 Door wont latch Repair High Priority Completed 2/17/24 2/16/24
358 soap will not prime Repair High Priority Completed 11/14/18 11/13/18
1889 beeping in bathroom either air freshner or toilet Preventive Maintenance High Priority Completed 12/10/24 12/9/24
1225 Window pane gaps Repair High Priority Completed 2/28/23 2/23/23
449 Ice Cream machine is making a very loud metal rubbing against metal noise Urgent High Priority Completed 3/7/19 3/6/19
1318 Faucet issue Repair High Priority Completed 5/20/23 5/19/23
1769 Podium rail Repair High Priority Completed 9/4/24 9/3/24
637 problems with lock on Business office door Urgent High Priority Completed 10/24/19 10/24/19
1285 drain Repair High Priority Completed 4/27/23 4/26/23
423 Bad wheel Repair High Priority Completed 1/25/19 1/24/19
1502 Chair arm on second floor concourse has come loose. Cosmetic High Priority Completed 12/1/23 11/28/23
298 Damaged Fire Door Safety High Priority Completed 10/13/18 10/12/18
732 install Cover-19 plexiglass at Call Hall Cosmetic High Priority Completed 8/7/20 8/3/20
1924 Temperature adjustment Union 302C Unspecified Assistance High Priority Completed 2/8/25 2/6/25
1470 Can light falling out of ceiling Cosmetic High Priority Completed 10/18/23 10/12/23
1258 file cabinet accidently locked - can't find key Repair High Priority Completed 4/8/23 4/3/23
1690 227 projector IT High Priority Completed 6/4/24 6/3/24
1562 Toliet cracked Repair High Priority Completed 2/17/24 2/16/24
1226 Window pane gaps Repair High Priority Completed 2/28/23 2/23/23
1015 toliet continuing to flush. water is shut off Preventive Maintenance High Priority Completed 5/11/22 5/10/22
450 Cabinet hinge is broken! Repair High Priority Completed 3/8/19 3/7/19
238 South stairwell handrail wire Repair High Priority Completed 9/21/18 8/31/18
1319 Door Repair High Priority Completed 5/20/23 5/19/23
1107 Paint and patch Custodial High Priority Completed 9/24/22 9/14/22
1625 Clock in Courtyard is display wrong time Cosmetic High Priority Completed 4/10/24 4/8/24
765 A couple issues with the padded scrubber Repair High Priority Completed 8/28/20 8/27/20
205 226 Table needs closers fixed Repair High Priority Completed 8/10/18 8/9/18
206 Sharps containers are full Safety High Priority Completed 8/10/18 8/9/18
1286 remove Employee Achievement plaque from wall Cosmetic High Priority Completed 4/27/23 4/26/23
1503 door closer broken Repair High Priority Completed 12/1/23 11/30/23
1991 Crestron in Wildcat Chamber IT High Priority Completed 4/18/25 4/17/25
606 Damage ceiling tile Cosmetic High Priority Completed 9/11/19 9/6/19
1596 Ceiling vents need cleaning Cosmetic High Priority Completed 4/5/24 3/13/24
36 soap is out Repair High Priority Completed 3/22/18 3/21/18
1259 Restroom stall missing latch Repair High Priority Completed 4/4/23 4/3/23
1227 Paint and patch needed for gallery, un-install is tomorrow Cosmetic High Priority Completed 3/2/23 2/27/23
Export Completed Orders