Completed Orders

E.g., 6/9/25
E.g., 6/9/25
Completed Orders
Number Title Type of Problem Prioritysort descending Progress Level Requested Deadline? Created
1348 Padded scrubber batteries Preventive Maintenance High Priority Completed 6/16/23 6/15/23
142 Hang Dry Erase Board Cosmetic High Priority Completed 6/21/18 6/19/18
1886 Washer is leaking when it is running and water is all over the floor behind it. Repair High Priority Completed 12/14/24 12/7/24
574 light bulbs Safety High Priority Completed 8/10/19 7/22/19
1223 1st sink in women's restroom is dripping. Repair High Priority Completed 2/25/23 2/19/23
235 Repair of handwash sink in Salad Spot Urgent High Priority Completed 9/8/18 8/30/18
111 put ice machine together Unspecified Assistance High Priority Completed 5/31/18 5/30/18
763 Faucet in south ground floor men's restroom not working. Repair High Priority Completed 8/24/20 8/19/20
203 Rocket Bowl lights Enhancement High Priority Completed 8/18/18 8/9/18
1283 Light Repair High Priority Completed 4/26/23 4/25/23
421 ice machine in Union Station Safety High Priority Completed 1/22/19 1/21/19
730 dish machine not reaching temp Safety High Priority Completed 8/7/20 7/31/20
603 Lock on the left door to the KSU Hallway will not unlock Urgent High Priority Completed 9/4/19 9/3/19
1040 call in service on three pieces of equipment in CFA Repair High Priority Completed 6/8/22 6/29/22
1468 Batterie issue Preventive Maintenance High Priority Completed 10/11/23 10/10/23
357 slow drain Repair High Priority Completed 11/13/18 11/12/18
1349 Batterie issue Repair High Priority Completed 6/17/23 6/16/23
143 the closing pistons have come off the folding vanity table Repair High Priority Completed 6/23/18 6/19/18
1224 Replace light bulb Repair High Priority Completed 2/22/23 2/21/23
1655 Faucet issue Repair High Priority Completed 4/26/24 4/25/24
1318 Faucet issue Repair High Priority Completed 5/20/23 5/19/23
89 bolts sticking up out of floor Safety High Priority Completed 5/21/18 5/17/18
1769 Podium rail Repair High Priority Completed 9/4/24 9/3/24
1284 sink issue Repair High Priority Completed 4/27/23 4/26/23
1073 install wall box for networking Enhancement High Priority Completed 8/11/22 8/5/22
22 Vent above fryer at Chick-fil-A Safety High Priority Completed 3/16/18 3/13/18
824 Need our (3) coin machines cleaned and repaired Preventive Maintenance High Priority Completed 3/3/21 3/2/21
265 Acoustical panel coming off in the Bowling Center Cosmetic High Priority Completed 9/25/18 9/18/18
1561 Door wont latch Repair High Priority Completed 2/17/24 2/16/24
358 soap will not prime Repair High Priority Completed 11/14/18 11/13/18
1889 beeping in bathroom either air freshner or toilet Preventive Maintenance High Priority Completed 12/10/24 12/9/24
1225 Window pane gaps Repair High Priority Completed 2/28/23 2/23/23
449 Ice Cream machine is making a very loud metal rubbing against metal noise Urgent High Priority Completed 3/7/19 3/6/19
1319 Door Repair High Priority Completed 5/20/23 5/19/23
1107 Paint and patch Custodial High Priority Completed 9/24/22 9/14/22
1625 Clock in Courtyard is display wrong time Cosmetic High Priority Completed 4/10/24 4/8/24
765 A couple issues with the padded scrubber Repair High Priority Completed 8/28/20 8/27/20
205 226 Table needs closers fixed Repair High Priority Completed 8/10/18 8/9/18
637 problems with lock on Business office door Urgent High Priority Completed 10/24/19 10/24/19
1285 drain Repair High Priority Completed 4/27/23 4/26/23
423 Bad wheel Repair High Priority Completed 1/25/19 1/24/19
1502 Chair arm on second floor concourse has come loose. Cosmetic High Priority Completed 12/1/23 11/28/23
298 Damaged Fire Door Safety High Priority Completed 10/13/18 10/12/18
732 install Cover-19 plexiglass at Call Hall Cosmetic High Priority Completed 8/7/20 8/3/20
1924 Temperature adjustment Union 302C Unspecified Assistance High Priority Completed 2/8/25 2/6/25
1470 Can light falling out of ceiling Cosmetic High Priority Completed 10/18/23 10/12/23
1258 file cabinet accidently locked - can't find key Repair High Priority Completed 4/8/23 4/3/23
1690 227 projector IT High Priority Completed 6/4/24 6/3/24
1562 Toliet cracked Repair High Priority Completed 2/17/24 2/16/24
145 urinals flow to low Repair High Priority Completed 6/21/18 6/20/18
Export Completed Orders