Completed Orders
Number | Title | Type of Problem |
Priority![]() |
Progress Level | Requested Deadline? | Created |
---|---|---|---|---|---|---|
287 | Toliet needs looked at | Repair | High Priority | Completed | 10/4/18 | 10/3/18 |
911 | Remount the Ohno bottle display. | Cosmetic | High Priority | Completed | 11/30/21 | 11/5/21 |
8 | Toilet still leaking | Repair | High Priority | Completed | 1/16/18 | 1/17/18 |
1356 | cylinder auto scrubber needs a wire gauge attached to it | Repair | High Priority | Completed | 6/23/23 | 6/22/23 |
114 | floor/wall panel falling off | Cosmetic | High Priority | Completed | 6/1/18 | 5/31/18 |
970 | Can light out in front of Chic Fil A | Safety | High Priority | Completed | 4/6/22 | 4/1/22 |
1777 | East Entrance Door | Repair | High Priority | Completed | 9/14/24 | 9/13/24 |
847 | recycle oil tank is full | Urgent | High Priority | Completed | 4/27/21 | 4/26/21 |
175 | clogged drain | Repair | High Priority | Completed | 7/25/18 | 7/24/18 |
943 | The Bowling Center Manager's desk computer will not work | IT | High Priority | Completed | 1/18/22 | 1/15/22 |
812 | Apply heat tape to the dock door strike | Preventive Maintenance | High Priority | Completed | 2/2/21 | 1/26/21 |
2036 | TOO COLD! | Unspecified Assistance | High Priority | Completed | 5/24/25 | 5/23/25 |
1246 | Hand sink in back prep area leaks from the drain pipe | Repair | High Priority | Completed | 3/21/23 | 3/20/23 |
1476 | there is a brown spot on the ceiling in the office | Urgent | High Priority | Completed | 10/25/23 | 10/24/23 |
147 | vacuum will not turn on | Repair | High Priority | Completed | 6/23/18 | 6/22/18 |
242 | Install student leader photo boards | Cosmetic | High Priority | Completed | 9/8/18 | 9/5/18 |
1568 | Director frames outside of the Director's Conf. Rm. | Unspecified Assistance | High Priority | Completed | 3/17/24 | 2/26/24 |
569 | Bench leg coming off | Repair | High Priority | Completed | 7/20/19 | 7/19/19 |
1664 | Fireside women's faucet | Repair | High Priority | Completed | 5/8/24 | 5/7/24 |
385 | Patch and paint purple walls in Radina's dining area | Cosmetic | High Priority | Completed | 1/19/19 | 1/3/19 |
209 | Install picture frame | Cosmetic | High Priority | Completed | 8/18/18 | 8/10/18 |
1778 | Could only get one microphone in Forum to turn on. | IT | High Priority | Completed | 9/22/24 | 9/15/24 |
1187 | hose to chemical dispenser | Repair | High Priority | Completed | 12/15/22 | 12/15/22 |
1062 | Mount Network cabinet in bowling | Enhancement | High Priority | Completed | 7/30/22 | 7/27/22 |
848 | bQjto sGZ BLGT | Custodial | High Priority | Completed | 4/29/21 | 4/28/21 |
353 | low water per flush | Repair | High Priority | Completed | 11/9/18 | 11/8/18 |
1736 | Camera not working | IT | High Priority | Completed | 7/26/24 | 7/25/24 |
1155 | Womans restroom smells like sewage | Urgent | High Priority | Completed | 10/28/22 | 10/27/22 |
1508 | Radina's drain is backing up | Urgent | High Priority | Completed | 12/5/23 | 12/4/23 |
1602 | Toilet not flushing | Repair | High Priority | Completed | 3/19/24 | 3/18/24 |
688 | dishwasher temp is not reaching 180 degrees for rinse | Safety | High Priority | Completed | 2/18/20 | 2/17/20 |
781 | Stall door broke | Repair | High Priority | Completed | 10/9/20 | 10/8/20 |
10 | Floor tile have come loose in the NE fire stairway. | Urgent | High Priority | Completed | 3/24/18 | 3/7/18 |
1569 | East Elevator stuck | Repair | High Priority | Completed | 2/28/24 | 2/27/24 |
1004 | Drains on the skywalk are clogged causing water to pool. | Urgent | High Priority | Completed | 5/20/22 | 5/5/22 |
1358 | Floor in the SW stairway is covered in grease and soil and need cleaning | Custodial | High Priority | Completed | 6/30/23 | 6/23/23 |
972 | 2nd floor service hallway light out | Safety | High Priority | Completed | 4/14/22 | 4/11/22 |
1188 | Pump Issues on the Kia Vac | Repair | High Priority | Completed | 12/20/22 | 12/19/22 |
177 | carpet extractor not putting out water | Repair | High Priority | Completed | 7/27/18 | 7/26/18 |
1279 | replace light bulbs | Repair | High Priority | Completed | 4/25/23 | 4/24/23 |
721 | Nosing has come off of a level in the Big 12 Room | Cosmetic | High Priority | Completed | 7/23/20 | 6/26/20 |
501 | clogged drain | Repair | High Priority | Completed | 5/1/19 | 4/30/19 |
1737 | 2nd floor concourse clock | Enhancement | High Priority | Completed | 7/30/24 | 7/29/24 |
1509 | Medical box | Repair | High Priority | Completed | 12/9/23 | 12/6/23 |
1248 | Toilet issue. | Repair | High Priority | Completed | 3/22/23 | 3/21/23 |
290 | Sink faucet handle came off | Repair | High Priority | Completed | 10/8/18 | 10/8/18 |
468 | automatic door button not working | Repair | High Priority | Completed | 4/2/19 | 4/1/19 |
1570 | East Elevator | Repair | High Priority | Completed | 2/28/24 | 2/27/24 |
659 | cooler not keeping temp | Safety | High Priority | Completed | 12/11/19 | 12/10/19 |
211 | Remove scaffolding from Ballroom | Unspecified Assistance | High Priority | Completed | 8/14/18 | 8/13/18 |
- 1 of 36
- next ›