Number: 1998
Post date: April 28, 2025
Name: Clayton Nelson
Department: Building Operations
Email: clnelso@ksu.edu [2]
Phone: (785) 770-2951
Type of Problem: Repair
Priority: Address When Possible
There was a leak next to lane 1 again in the bowling center, it seemed to be around the pillar on the ramp and ran down through the carpet on to the tile.
Specific Location: SB - SB006 - Wabash Cannon Bowl
Requested Deadline?: April 29, 2025
Progress Level: In Progress