Published on K-State Student Union (http://www.union.ksu.edu)

Home > Damaged ceiling tile in Konza Hallway need repair / replaced.

Damaged ceiling tile in Konza Hallway need repair / replaced.

Number: 1852

Post date: November 8, 2024

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: High Priority

Long Description of Problem: 

The ceiling tile in the Konza Hallway needs corrected.

Specific Location: 2 - CR204 - 200 Room Hallway

Requested Deadline?: November 9, 2024

Work Details

Progress Level: In Progress


Source URL:http://www.union.ksu.edu/workorder/2024/11/08/damaged-ceiling-tile-in-konza-hallway-need-repair-replaced

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/konza_hallway_tile.jpg?itok=fa3Wve4E [2] mailto:cjohnson@ksu.edu