Published on K-State Student Union (http://www.union.ksu.edu)

Home > 2nd floor South Men's sinks

2nd floor South Men's sinks

Number: 1832

Post date: October 28, 2024

Submission

Name: Clayton Nelson

Department: Building Operations

Email: clnelso@ksu.edu [1]

Phone: (785) 770-2951

Type of Problem: Repair

Priority: High Priority

Long Description of Problem: 

The sinks have a clog in the plumbing line somewhere and will back up after the sinks have been used for a while. Called Mike to look at it on 10/28/24 but he only had 10 minutes left before leaving. It had finally drained by the time Nelson did restrooms, but the clog is still present and requires the water to run for some time before it backs up.

Specific Location: 2 - 220 - 2nd Floor South Men's Restroom

Requested Deadline?: October 29, 2024

Work Details

Progress Level: In Progress


Source URL:http://www.union.ksu.edu/workorder/2024/10/28/2nd-floor-south-mens-sinks

Links
[1] mailto:clnelso@ksu.edu