Published on K-State Student Union (http://www.union.ksu.edu)

Home > Damage ceiling tile requiring replacment

Damage ceiling tile requiring replacment

Number: 1723

Post date: July 15, 2024

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Safety

Priority: Address When Possible

Long Description of Problem: 

A ceiling tile in the second floor concourse near the KSU door is damaged and needs replacement.

Specific Location: 2 - CR201 - 2nd Floor Concourse

Requested Deadline?: July 20, 2024

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2024/07/15/damage-ceiling-tile-requiring-replacment

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/concourse_ceiling_tile.jpg?itok=6PTvAi6z [2] mailto:cjohnson@ksu.edu