Published on K-State Student Union (http://www.union.ksu.edu)

Home > There is a column in S/U Ballroom that was damaged. A repair was made, but is is incomplete.

There is a column in S/U Ballroom that was damaged. A repair was made, but is is incomplete.

Number: 1389

Post date: August 2, 2023

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

There is a column in S/U Ballroom that was damaged. A repair was made, but is is incomplete. Additional work is needed to this patch and the entire column. The entire column should be repainted at that time.

Specific Location: 2 - 233 - S Ballroom

Requested Deadline?: August 19, 2023

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2023/08/02/there-is-a-column-in-su-ballroom-that-was-damaged-a-repair-was-made-but-is-is

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/s_ballroom_column_repair.jpg?itok=DzJddbs7 [2] mailto:cjohnson@ksu.edu