Published on K-State Student Union (http://www.union.ksu.edu)

Home > Severe damage to plaster on Ballroom column

Severe damage to plaster on Ballroom column

Number: 1137

Post date: October 14, 2022

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

One of the columns in S/U Ballroom has been hit with a wall section and the plaster is broken of and requires repair.

Specific Location: 2 - 234 - U Ballroom

Requested Deadline?: November 5, 2022

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2022/10/14/severe-damage-to-plaster-on-ballroom-column

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/column_repair.jpg?itok=frtBGsNP [2] mailto:cjohnson@ksu.edu