Number: 1018
Post date: May 24, 2022
Name: Cluade Meliza
Department: Building Operations
Email: bsultzer@ksu.edu [1]
Phone: (785) 770-2951
Type of Problem: Safety
Priority: Immediate Action Required
A support on the handrail is missing. North side of the handicap railing leading to the lanes
Specific Location: SB - SB006 - Wabash Cannon Bowl
Requested Deadline?: May 25, 2022
Progress Level: Completed