Published on K-State Student Union (http://www.union.ksu.edu)

Home > Base moulding on 2nd floor concourse needs repair

Base moulding on 2nd floor concourse needs repair

Number: 995

Post date: April 26, 2022

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Repair

Priority: Address When Possible

Long Description of Problem: 

Wooden base has come loose and needs to be re-nailed to the wall.

Specific Location: 2 - CR201 - 2nd Floor Concourse

Requested Deadline?: May 7, 2022

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2022/04/26/base-moulding-on-2nd-floor-concourse-needs-repair

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/base_repair_needed_outside_dir_off.jpg?itok=hqfWHcwO [2] mailto:cjohnson@ksu.edu