Published on K-State Student Union (http://www.union.ksu.edu)

Home > Base molding has come loose and needs to be renailed.

Base molding has come loose and needs to be renailed.

Number: 987

Post date: April 18, 2022

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

There is a strip of base molding in the hallway leading to the Veteran's Center that is coming away from the wall and needs to be re nailed.

Specific Location: 2 - 217 - KState Veterans Center

Requested Deadline?: April 29, 2022

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2022/04/18/base-molding-has-come-loose-and-needs-to-be-renailed

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/base_repair_needed.jpg?itok=iSdi1Ok8 [2] mailto:cjohnson@ksu.edu