Published on K-State Student Union (http://www.union.ksu.edu)

Home > Replace damaged ceiling tile in the Big 12 Room

Replace damaged ceiling tile in the Big 12 Room

Number: 955

Post date: February 11, 2022

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

Stained ceiling tile at the front of the Big 12 Room need to be replaced.

Specific Location: 2 - 221 - Big 12 Room

Requested Deadline?: February 19, 2022

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2022/02/11/replace-damaged-ceiling-tile-in-the-big-12-room

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/big_12_ceiling_tile_damage.jpg?itok=VsPRcc07 [2] mailto:cjohnson@ksu.edu