Published on K-State Student Union (http://www.union.ksu.edu)

Home > Carpet edging has come loose

Carpet edging has come loose

Number: 804

Post date: January 11, 2021

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

There is a piece of carpet edging around a column near the east elevator on ground floor that is starting to fall off and needs repair.

Specific Location: G - LB003 - Ground Floor Concourse

Requested Deadline?: January 30, 2021

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2021/01/11/carpet-edging-has-come-loose

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/loose_edging.jpg?itok=6IPDGxVS [2] mailto:cjohnson@ksu.edu