Published on K-State Student Union (http://www.union.ksu.edu)

Home > Carpet transition strip is broken and needs replacment

Carpet transition strip is broken and needs replacment

Number: 720

Post date: June 25, 2020

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

The carpet transition strip in front of the counter in the Bowling Center has broken and come out. A replacement needs to be installed.

Specific Location: SB - SB006 - Wabash Cannon Bowl

Requested Deadline?: July 31, 2020

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2020/06/25/carpet-transition-strip-is-broken-and-needs-replacment

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_2599.jpg?itok=elcpT4oR [2] mailto:cjohnson@ksu.edu