Published on K-State Student Union (http://www.union.ksu.edu)

Home > Patch and paint a ding in the second floor north hallway

Patch and paint a ding in the second floor north hallway

Number: 705

Post date: March 23, 2020

Submission

[1]

Name: Craig Johnson

Department: Building Operation

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

A ding was put in the wall by a hand card and requires patching and painting about 12" above the floor on the south wall in the hallway east of the Director's Conference Room.

Specific Location: 2 - CR204 - 200 Room Hallway

Requested Deadline?: March 24, 2020

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2020/03/23/patch-and-paint-a-ding-in-the-second-floor-north-hallway

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_2156.jpg?itok=2mHAZvBk [2] mailto:cjohnson@ksu.edu