Published on K-State Student Union (http://www.union.ksu.edu)

Home > Replacement of damaged ceiling tile in K and S Ballroom

Replacement of damaged ceiling tile in K and S Ballroom

Number: 696

Post date: February 26, 2020

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Repair

Priority: High Priority

Long Description of Problem: 

Replace the damaged ceiling tile in K and S Ballroom that were broken during the episode with the cat in the ceiling.

Specific Location: 2 - 232 - K Ballroom

Requested Deadline?: February 5, 2020

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2020/02/26/replacement-of-damaged-ceiling-tile-in-k-and-s-ballroom

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_2121.jpg?itok=AQAr9HsB [2] mailto:cjohnson@ksu.edu