Published on K-State Student Union (http://www.union.ksu.edu)

Home > Damage ceiling tile

Damage ceiling tile

Number: 606

Post date: September 6, 2019

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: High Priority

Long Description of Problem: 

The ceiling tile next to the KSU hallway has been damaged from moisture and needs to be replaced.

Specific Location: 2 - CR201 - 2nd Floor Concourse

Requested Deadline?: September 11, 2019

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2019/09/06/damage-ceiling-tile

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_1630.jpg?itok=MFUQiaZV [2] mailto:cjohnson@ksu.edu