Published on K-State Student Union (http://www.union.ksu.edu)

Home > Gap in the flooring in front of a window in Forum Hall

Gap in the flooring in front of a window in Forum Hall

Number: 445

Post date: March 1, 2019

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

There is a gap in the floor tile/grout in front of a window in Forum hall than needs to be filled in.

Specific Location: G - 011 - Forum Hall Lobby

Requested Deadline?: March 16, 2019

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2019/03/01/gap-in-the-flooring-in-front-of-a-window-in-forum-hall

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_1261.jpg?itok=HNak7g8d [2] mailto:cjohnson@ksu.edu