Number: 434

Post date: February 14, 2019

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

There are two ceiling tile just outside of the KSU Hallway that were cut to accommodate a former sign. The sign has been removed and these two tile need to be replaced.

Specific Location: 2 - CR201 - 2nd Floor Concourse

Requested Deadline?: February 28, 2019

Work Details

Progress Level: Completed