Published on K-State Student Union (http://www.union.ksu.edu)

Home > Demo old bathroom on Ballroom stage.

Demo old bathroom on Ballroom stage.

Number: 433

Post date: February 14, 2019

Submission

[1] [2]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [3]

Phone: (785) 532-6591

Type of Problem: Enhancement

Priority: Address When Possible

Long Description of Problem: 

Remove old toilet and sink and cap lines in the old Ballroom stage bathroom. Repair wall,

Specific Location: 2 - 235 - Ballroom Stage

Requested Deadline?: March 9, 2019

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2019/02/14/demo-old-bathroom-on-ballroom-stage

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_1210.jpg?itok=F6oANE1G [2] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_1211.jpg?itok=hgaILjkv [3] mailto:cjohnson@ksu.edu