Published on K-State Student Union (http://www.union.ksu.edu)

Home > Leaking pipes on first floor

Leaking pipes on first floor

Number: 260

Post date: September 15, 2018

Submission

[1] [2]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [3]

Phone: (785) 532-6591

Type of Problem: Safety

Priority: High Priority

Long Description of Problem: 

The leak near the welcome desk is persistent and needs to be investigated for possible leak.

Specific Location: 1 - LB101 - Welcome Desk

Requested Deadline?: September 22, 2018

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2018/09/15/leaking-pipes-on-first-floor

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_0955.jpg?itok=KzqGx7SG [2] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/pipe_leak.jpg?itok=0faujJSg [3] mailto:cjohnson@ksu.edu