Published on K-State Student Union (http://www.union.ksu.edu)

Home > Piece of wood molding broken needs restained.

Piece of wood molding broken needs restained.

Number: 191

Post date: August 3, 2018

Submission

[1]

Name: Craig Johnson

Department: Building Operations

Email: cjohnson@ksu.edu [2]

Phone: (785) 532-6591

Type of Problem: Cosmetic

Priority: Address When Possible

Long Description of Problem: 

exposed wood needs re stained to match the rest of the door frame.

Specific Location: Other

Other Location: Bluemont hallway

Requested Deadline?: August 18, 2018

Work Details

Progress Level: Completed


Source URL:http://www.union.ksu.edu/workorder/2018/08/03/piece-of-wood-molding-broken-needs-restained

Links
[1] http://www.union.ksu.edu/sites/default/files/styles/maximum/public/img_0840.jpg?itok=CvTQFxB1 [2] mailto:cjohnson@ksu.edu